Download this report here. The purpose of the Great Pond Watershed-Based Management Plan (WBMP) Project was to develop a comprehensive WBMP for Great Pond that included EPA’s nine minimum elements for watershed-based plans and well-developed implementation strategies that will effectively restore the water quality of Great Pond over the next 10 years. The plan established water quality thresholds, evaluated the need for in-lake treatment strategies, and developed water quality restoration strategies for addressing current sources of NPS pollution in the lake and its watershed. The project was guided by a steering committee and technical advisory committee that each met three times during the project. |